Schools
Project Sample
WEST
COUNTY HIGH SCHOOL
Chantilly, Virginia
Working
with Gassman Corporation, the General Contractor, Shapiro
& Duncan installed the HVAC and plumbing systems for
West County High School, a new 373,000 SF 21st century model
educational facility that can accommodate 2,600 students.
Today the school has been renamed West Field High School.
The facility includes a two-story media center, state-of-the-art
classrooms, and a field house. The challenge taken on by Gassman
was to complete in two years a project that would ordinarily
require three years. Working as a team, the project was completed
within the required schedule and on budget.
Shapiro
& Duncan won an "Excellence in Construction Award for the
Best Mechanical Project 2000" from the Associated Builders
and Contractors.
For the
HVAC, Shapiro & Duncan installed:
- Over
32 miles of copper and steel pipe and two Trane centrifugal
direct drive chillers with a total capacity of 800 tons
for the Central Chiller Plant;
- A Baltimore
Aircoil Company cooling tower with a cooling capacity of
up to 3000 gal/min of condensing water;
- Two
Burnham boilers with a heating capacity of over 22 million
BTUs;
- Trane
fan coil units and unit ventilators to heat and cool the
classrooms;
- Trane
modular Climate Master air handling units with heating and
cooling capability for the building common
areas; and
- Roof-mounted
and interior Heatex make-up air units to temper fresh air,
which is so important to the health of the building.
For the
Plumbing System, Shapiro & Duncan installed:
- Cast
iron, copper, and polypropylene piping systems;
- Lochinvar
power fin boilers for domestic heating water;
- Kohler
Company plumbing fixtures in the Field House restrooms;
and
- Plumbing
for the commercial kitchen that produces meals for elementary
and secondary schools in the area.
|

|